TS. Setup Task list

On the left side of the Alastri Tactical Scheduler screen, in the Setup tab, there is a hierarchy of all applicable setup tasks, organized in an ordered Setup Task list. The tasks displayed in this listing change depending on the flags selected in the first setup step of the Configuration Options. Below is an example of the maximum display of all steps with the flags selected for Use Extensions, Use Drills, Specify Known Parcels, and Allow Reserves Hacking.

Tactical Scheduler setup options dependencies

A complete list of all configuration steps with clickable links is provided at the end of this section.

You cannot go to the Reserves and Schedule tabs until you complete all the Setup Task steps.

Note that:

  • The Extension Source step is shown in the Setup Task list only if the Use Extensions flag is enabled in the Configuration Options step.

  • The Drilling Fields, Drill Hole Types, Drilling, and Drills steps are shown in the Setup Task list only if the Use Drills flag is enabled in the Configuration Options step.

  • The Known Mining Parcels step is shown in the Setup Task list only if the Specify Known Parcels flag is enabled in the Configuration Options step.

  • The Drilling Block Hacking and Mining Block Hacking steps are shown in the Setup Task list only if the Allow Reserves Hacking flag is enabled in the Configuration Options step.

  • Enabling flags for Embed Rapid Reserver / Do Not Embed Rapid Reserver and Constrain on Trucks / Optimise Products do not add new steps to the Setup Task list.

A full list of Setup Tasks showing all possible steps: