SC. Stage Plans

With Spacial Conformetrics 2.0 and above, users can choose to account for actual mining direction in generated stage plans. This means that, if a block is 50% scheduled and 50% mined, then it can achieve 100% conformance regardless of the original scheduled mining direction.

Stage Plans steps are only visible if Generate Stage Plans option is flagged in the Settings step.

Stage Plans Setup Task, consists of three steps:

Once the stage plans have been generated, finish the Setup (run all the setup tasks) and evaluate spatial conformance in the Conformance tab.

Main Conformance view